Annual maintenance contracts

Gas analyser AMC: what to put in the contract

An annual maintenance contract buys a measurement that stays right between visits. It works when the scope names every analyser, every visit and every consumable, so that nobody argues about them in the eleventh month.

Quick answer

An annual maintenance contract for online gas analysers should list every instrument by make, model and serial number, the preventive visits and what each does, breakdown support, the consumables and spares included, the calibration method and gases, site support, records and exclusions. Decide first whether it is comprehensive (parts included) or non-comprehensive.

Two kinds of contract

Comprehensive or non-comprehensive: decide who pays for the parts.

PointNon-comprehensive AMCComprehensive AMC
Preventive visitsIncluded, at the agreed frequencyIncluded, at the agreed frequency
Breakdown visitsIncluded or charged per visit, as agreedIncluded
Sensors, pump kits, filter elementsCharged when usedIncluded, within a stated list
Calibration gasesUsually the plant'sUsually the plant's; state it either way
SuitsPlants with their own spares stock and instrument teamPlants that want one fixed annual figure

Most government and PSU tenders say which kind they want in the title ("comprehensive AMC", "non-comprehensive AMC"). If yours does not, decide it first: it changes the price more than anything else in the scope.

The scope

Eight lines that make an AMC work.

Use them in a purchase requisition, a GeM bid or a tender schedule.

  1. The instrument list: make, model, serial number, measurement, range and location of every analyser and sample system covered
  2. Preventive visits: how many a year, and what each visit does (inspection, sample system check, zero and span check, cleaning, filter change)
  3. Breakdown support: how a fault is reported and whether breakdown visits are inside the contract
  4. Consumables and spares: which are included, by part, and which are charged
  5. Calibration: method, gases, who supplies them, and the record left after each check
  6. Site support: permits, access, scaffolding, utilities and an escort, which are the plant's
  7. Records: a report per visit, and the analyser's own calibration and alarm history kept with it
  8. Exclusions: damage from process upsets, sample conditions outside the datasheet, and changes made by others
What the analysers already record

Plan the visits from data, not the calendar alone.

ACCURRA analysers keep calibration, alarm and fault records with time stamps, showing calibration drift and residual sensor life. i-Cons conditioners track the remaining life of filters, pump tubes and pump kits. Read over Modbus RTU, these records tell you which instruments need a visit sooner and which can wait.

Sensor life sets most of the consumables budget. ACCURRA-S electrochemical oxygen sensors are rated above 18 months (trace, 3015) and above 2 years (percent and purity); NDIR channels for CO, CO2 and methane above 5 years; paramagnetic models 3130 and 3190 have no consumable sensor. See sensors and spares for each model.

For intervals, see how often to calibrate and the maintenance schedule and spares lesson.

Ask for a proposal

Send the instrument list. We propose the scope.

For ACCURRA analysers, i-Cons conditioners and Sarvesh sample systems, we propose the visits, spares and calibration plan from the instrument list. For analysers of other makes in the same plant, list them too: we will say which we can include and which we cannot.

Send the make, model and serial number of each instrument, where it is, and the kind of contract you want. Support: +91 94 2300 4178.

Ask for an AMC proposalAll service and support